学习宝典考试外语详情

雅思写作小作文流程图满分范文

2020-11-20外语

  流程图写作是雅思常会遇到的小作文类型之一,考生可在平时对这一类的小作文进行一些必要的练习。下面是小编送给大家的两篇雅思写作小作文流程图满分范文,希望对大家有所帮助。

  雅思写作小作文流程图满分范文一

   话题:

  The diagrams below show how houses can be protected in areas which are prone to flooding.

   范文

  The diagrams compare two different methods of defence for homes which are at risk of being flooded.

  The key difference between the diagrams is that they show flood protection with and without a stopbank. In either case, the at-risk home is raised on stilts above ground level.

  The first diagram shows how a stopbank acts as a flood barrier to stop river water from flooding homes. The stopbank is a small mound of land next to the river that is higher than the 100-year flood level, and prevents the river from bursting its banks. Nearby houses can be built on stilts to prevent flooding from rainwater, and a floodgate beneath the stopbank can be opened to allow this ‘ponding’ to drain off into the river.

  When there is no stopbank, as shown in the second diagram, there will be nothing to stop the river from flooding. In this case, the solution is to put buildings on stilts. The height of the stilts is measured so that the floor of the house is 300mm above the 100-year flood level. This measurement is called the ‘freeboard’.

  雅思写作小作文流程图满分范文二

    话题:

  The diagram below shows how solar panels can be used to provide electricity for domestic use.

   范文

  The picture illustrates the process of producing electricity in a home using solar panels.

  It is clear that there are five distinct stages in this process, beginning with the capture of energy from sunlight. The final two steps show how domestic electricity is connected to the external power supply.

  At the first stage in the process, solar panels on the roof of a normal house take energy from the sun and convert it into DC current. Next, this current is passed to an inverter, which changes it to AC current and regulates the supply of electricity. At stage three, electricity is supplied to the home from an electrical panel.

  At the fourth step shown on the diagram, a utility meter in the home is responsible for sending any extra electric power outside the house into the grid. Finally, if the solar panels do not provide enough energy for the household, electricity will flow from the utility grid into the home through the meter.

再来一篇
上一篇:2020雅思写作地图题参考范文下一篇:2020雅思写作流程图参考范文
猜你喜欢